What is Reverse Phase Scheduling

Traditionally, the construction/build sequence is created using the reverse phase scheduling approach, which enables the key dates for work packages to start on site to be determined and creates the “critical” start on site date for the project.

Why is it called pull planning?

Pull Planning is a process that gets its name from the idea that the planning of a project starts with a future goal or milestone in mind and pulls information from that point to the start of the project.

What is pull planning?

Pull planning works as a scheduling tool for the Last Planner System (LPS), which is based on a collaborative approach to managing a project. … It starts with the project milestones, such as the completion date and works backward from the steps that efficiently lead to those milestones.

What is pull Meeting?

In a typical pull planning session, work is visualized using hand-written and color-coded sticky notes. In these collaborative meetings, each stakeholder identifies and plots their specific tasks on their unique-colored sticky notes along a timeline.

What is last planner?

The Last Planner System (LPS) is a workflow method developed by the Lean Construction Institute to increase worker productivity and accountability through tight scheduling and detailed group planning. Last Planner is seen as a managerial approach on how to efficiently run a construction project.

What is pull planning expertise?

Pull planning is a lean construction practice in which every key stakeholder on a project collaboratively starts with the end goal and works backward milestone by milestone toward the start date. … Pull planning is usually visualized using a hand-written timeline and color-coded sticky notes denoting each specific task.

What is pole planning?

P.O.L.E. stands for Plan, Organize, Lead, and Evaluate. … Below are the desirable steps to planning, organizing, leading, and evaluating. Plan. Plan is the first step in P.O.L.E.

What is the meaning of pulled in?

1 : check, restrain. 2 : arrest. intransitive verb. : to arrive at a destination or come to a stop. Synonyms & Antonyms Example Sentences Learn More About pull in.

What is push pull in construction?

Also referred to as “stabilisation props”, they operate pulling and pushing to hold the formworks in position when laying at the site.

What is Lean scheduling?

Scheduling is an important part of project management in construction. … Lean construction scheduling is a way to design processes and procedures to minimize waste in the workplace to maximize value. Schedules detail each construction activity for the project team and how long it should take to complete each one.

Article first time published on

What does lean mean in construction?

Lean Construction is a “way to design production systems to minimize waste of materials, time, and effort in order to generate the maximum possible amount of value,” (Koskela et al. 2002).

What is a constraint log?

The constraint log is a cumulative report of all constraints identified on a project. “Constraint Description” column will be the description of the constraint as it is written in the plan.

What are the 2 main components of the Last Planner System?

The Last Planner System has a number of measures: Percent Plan (or Promises) Complete (often referred to as PPC, a measure of plan reliability). Tasks made ready (a measure of the effectiveness of the Make Ready Process). Tasks anticipated (a measure of the ability of the team to anticipate the work they need to plan).

What is a line of balance?

Line of Balance (LOB) is a management control process for collecting, measuring, and presenting facts relating to time (see Schedule Control), cost, and accomplishment – all measured against a specific plan. … Comparing actual progress with a formal objective plan.

What is a look ahead schedule?

Usually, a lookahead schedule is simply a drop out from the higher level schedule, occasionally at a greater level of detail, but with no screening of scheduled activities against soundness or other criteria. The prevailing idea seems to be simply that thinking ahead is beneficial.

How does pull Planning reduce project schedules?

Schedule Trimming Pull planning allows stakeholders to identify potential roadblocks that could appear down the road. By identifying these roadblocks early, steps can be taken to avoid them, thus cutting down time. Pull planning reduces waste, redundancy, and wait times.

What is push plan?

Push planning entails the forward sequencing of activities from a defined start date. A single kickoff activity, or group of activities, leads to the identification and sequencing of additional successor activities. The plan is developed in a forward motion. … Push planning is common because it is quick.

Who invented pull planning?

The Lean Construction Institute (LCI) and its founders Glen Ballard and Greg Howell certainly deserve the credit for their work in suggesting that the concepts of the Pull System or Just in Time (JIT) used so successfully in manufacturing could be applied to construction projects to improve scheduling reliability.

What is the English meaning of Pul?

/pula/ mn. bridge countable noun. A bridge is a structure built over a river, road, or railway so that people or vehicles can cross from one side to the other.

What is pull date?

Definition of pull date : a date stamped on perishable products (such as baked goods or dairy products) after which they should not be sold.

What is difference between pull up and pull over?

“Pulling over” is usually “driving over to the side of the road and parking” when a police car follows you with sirens on, but can also be the same as “pulling aside.” “Pulling up” is “arriving” at your destination, usually in a vehicle.

What are the 5 principles of lean?

According to Womack and Jones, there are five key lean principles: value, value stream, flow, pull, and perfection.

What is value in lean construction?

Value – the definition of value in lean is everything the customer is willing to pay for.

What is not one of the five lean principles?

The five principles are considered a recipe for improving workplace efficiency and include: 1) defining value, 2) mapping the value stream, 3) creating flow, 4) using a pull system, and 5) pursuing perfection.

What are principles of construction?

The Five Construction Principles have been established so that the five elements: environmental protection, safety, speed, economy, and aesthetics, conform with a balanced regular pentagon.

What are the 3 constraints?

With any project, there are limitations and risks that need to be addressed to ensure the project’s ultimate success. The three primary constraints that project managers should be familiar with are time, scope, and cost. These are frequently known as the triple constraints or the project management triangle.

What are the 2 constraints?

The second and third lines define two constraints, the first of which is an inequality constraint and the second of which is an equality constraint. These two constraints are hard constraints, meaning that it is required that they be satisfied; they define the feasible set of candidate solutions.

What is scope triangle?

Called the “Scope Triangle” or the “Quality Triangle” this shows the trade-offs inherent in any project. The triangle illustrates the relationship between three primary forces in a project. … For example time is often fixed and the quality of the end product will depend on the cost or resources available.

Why is it called the Last Planner?

Master Planning, part one, is done at the very beginning of a project. … The term “last planner” refers to the people on the team responsible for making the final assignment of work to specific performers and ensuring they have the materials, equipment and information available to complete their assignments.

What is PPC last planner?

The Last Planner™ System measures reliability in terms of Percent Plan Complete or PPC. PPC is the number of actual task completions divided by the number assigned for a given week. PPC assesses the extent to which the Last Planner™ was able to anticipate what work would get done in the upcoming week.

Who created last planner system?

The Last Planner® System (LPS) is a production planning system designed to produce predictable work flow and rapid learning in programming, design, construction and commissioning of projects. LPS was developed by Glenn Ballard and Greg Howell and has five elements.